Implementation Tracking
Create an implementation checklist from a completed BIP audit, record readiness and team preparation, and keep component and phase progress accurate.
- Plans
- Practice and higher
- For:
- Teachers, BCBAs and specialists, Administrators
- Read time
- 8 min read
- Updated
Create and reopen the right checklist
- Open Implementation Checklist from the advanced tools in More on a phone or the desktop sidebar. The page shows checklists created by your account for students you can currently access.
- To create one, open BIP Audit, then a completed audit. Confirm its linked student and reviewed plan. Choose Create Implementation Checklist. If asked, select the intended existing student. The saved checklist opens directly.
- Confirm the plan name, target behavior and hypothesized function. Checklist tasks are a general starting structure; the responsible team must confirm their relevance to the reviewed plan.
- Use Close to return to the list. Open the saved card to resume. The list shows up to 50 recent checklists; filters include All, Pre-Implementation, Initial, Established, Maintenance and Completed. A filter can hide a checklist without deleting it.
Record readiness before implementation
- Choose Readiness. On a phone the workspace tabs wrap onto additional lines. Expand a category if its items are collapsed.
- Read each item and mark it only when the preparation actually occurred. Required items have an asterisk. Wait for Saving... to finish before the next change.
- Reload or reopen the checklist and confirm the item remains checked. Correct a mistake by clearing the same item. Review any blocking issues with the responsible team before starting implementation.
The overall progress indicator combines readiness (30%) and component completion (70%). It is a checklist completion measure, not a fidelity score or evidence of improved student outcomes.
Track component completion and corrections
- Choose Components and expand the relevant component. Read its description and checklist items.
- Mark completed work one item at a time. A partially completed component shows In Progress; checking all its items changes it to Implemented.
- If an item was marked in error or work must be repeated, clear it. The component returns to an incomplete status and the progress count updates. Reopen the checklist to verify the correction.
Record responsibilities, training and sign-off
- Choose Team, then Add Member. Enter the person’s name and implementation role. Email is optional.
- Under Responsibilities, enter a task and choose Add. Repeat as needed, then choose Add Member in the dialog.
- Mark Trained and Signed Off only after those activities actually occur. Reopen the checklist and confirm the statuses. Clear a mistaken status instead of leaving an inaccurate record.
Check milestones and record phase changes
- Choose Milestones and review the criteria and target dates. Mark criteria when supported by actual evidence. All criteria met completes a milestone; clearing a mistaken criterion reopens it.
- At Implementation Phase, scroll the phase row horizontally on a phone to see all five phases. Choose the next phase, or a previous phase when the team needs to revisit work.
- Enter a Reason for transition and choose Confirm Transition. If the save fails, the dialog keeps the reason so you can retry.
- Open View phase history after a transition and confirm the saved phase. Implementation checklist phases do not retag observation records, change chart markers or approve a BIP.
Resolve missing records or failed saves
- If the list cannot load, read the error and use Retry loading after confirming your connection and current access. A loading error is not an empty list.
- If a card is missing, clear the phase filter and confirm you are using the account that created it. Check the intended audit and student before creating another checklist.
- If a change fails, the checklist remains open with an error. Retry the change and reopen the record to confirm it persisted. Do not assume a checked control alone proves the server saved it.
- Use the Step-by-step guide link above the workspace to keep these instructions in a separate tab. Screenshot zoom opens the authentic fictional example; close it to return to the steps.